Files
Download Full Text (4.2 MB)
Description
The Effects of a Mandatory Early Shutdown of Maine Yankee
Maine State Planning Office - Richard Silkman, Director (September 1987).
Contents: Introduction / Legal Issues / Economic Issues / Health and Environmental Issues / Conclusions / Appendices
Publication Date
9-1987
Publisher
Maine State Planning Office
City
Augusta, Maine
Keywords
Atomic Power, Atomic Power Plants, Nuclear Power, Nuclear Power Plants, Power Generation, Nuclear Reactors, Nuclear Waste
Disciplines
Energy Systems | Environmental Health and Protection | Environmental Law | Nuclear | Nuclear Engineering | Oil, Gas, and Energy
Recommended Citation
Maine State Planning Office, "The Effects of a Mandatory Early Shutdown of Maine Yankee" (1987). Maine Collection. 98.
https://digitalcommons.usm.maine.edu/me_collection/98
Creative Commons License
This work has been identified with a Creative Commons Public Domain Mark 1.0.
![The Effects of a Mandatory Early Shutdown of Maine Yankee](https://digitalcommons.usm.maine.edu/me_collection/1098/thumbnail.jpg)
Included in
Energy Systems Commons, Environmental Health and Protection Commons, Environmental Law Commons, Nuclear Commons, Nuclear Engineering Commons, Oil, Gas, and Energy Commons
Comments
USM Library Stacks; TK 1344 .M2 M3563 1987